Doubel Combustion Chamber

All Incinerators are Doubel Combustion Chamber with One Fuel Burner Each. After Burner Technology for Completely Combustion and Cleaner World.

Read More

High Temperature Incineration

Temperature Range 800 Degree to 1200 Degree in Combustion Chamber. Temperature Thermocouple Monitor and Controller. High Quality Fire Brick and Refactory Cement.

Read More

Get Lastest News

There are latest incinerator news like technical, public news, business tender for medical waste incinerator,animal incineration, pet cremation

Read More

Nanjing Clover Medical Technology Co.,Ltd.

Email: [email protected] | Tel: +86-25-8461 0201

Regular model incinerator for market with burning rate from 10kgs to 500kgs per hour and we always proposal customer send us their require details, like waste material, local site fuel and power supply, incinerator operation time, etc, so we can proposal right model or custom made with different structure or dimensions.
Incinerator Model YD-100 is a middle scale incineration machine for many different usage: for a middle hospital sickbed below 500 units, for all small or big size family pets (like Alaskan Malamute Dog), for community Municipal Solid Waste Incineration, etc. The primary combustion chamber volume is 1200Liters (1.2m3) and use diesel oil or natural gas fuel burner original from Italy.

Latest Post

Incinerator Capacity of destruction in weight: 60Kg/h

1.Capacity of destruction in weight: 60Kg/h
2.It should be able to operate not less than 10 hours/day.
3.This incinerator must be able to destruct all combustible wastes produced by hospitals, private clinics, laboratories, institutes, etc..
4.Design Specification: Types A, B, C, D and E of medical waste
5.“PYROLYTIC” combustion by controlling the gasification of waste.
6.The incinerator must avoid the release of black smoke and fine dust, (smokeless) during the loadings.
7.It should be able to reduce the volume of wastes by 98%
8.It should be able to hold emission in the second burn with gas residence of not less than 2 seconds.
9.The incineration should be completely free from visible smoke as well as offensive odours.
10.The lower calorific power (L.C.P) of this waste will be 3,500 kcal/kg
the temperatures of combustion: Minimum will be 850oC and max 1400oC
post combustion:>1100oC
11.The internal diameter of the chimney:Ø400 and its height: 8m
12.The volume of the combustion chamber: 1,200L
13.The dimension of the door for loading in cm: 70 x 70
14.Burner operation should be automatic on/off
15.Fuel: diesel
16.The supplier must provide necessary information for the best of the installation.  This incinerator with “PYROLYTIC” combustion must have:
17.A combustion chamber of waste:
Perfectly tight door for the manual loading of waste.  The loading should be manual, batch load.
A burner of lighting which the use is limited to the ignition of waste.
Frontage of loading with door seals gone up on hinges, wheel of screw plug, flexible joint, and stuffing insulating out of refractory.
The insulation of the combustion chamber should be composed of refractory bricks, having a high content of aluminium and insulates bricks in order to assure a minimum temperature on the outside sheet metal.
Composition of the refractory;
Refractory concrete:
Thickness :>100mm
Nature: 42% of Al203
Insulate in fibrous panels:
Thickness: >75mm
Nature: Calcium silicate.
Burner of lighting of waste, with fuel, standard mono-bloc casting guiding plunging flame, lighting and safety of electronic ignition, permanent ventilation, electromagnetic sluice gate of regulation and isolating valve.
Plate of combustion in Carborundum, avoiding the fixing of glass and slags.

Incinerator Capacity of destruction in weight: 60Kg/h

1.Capacity of destruction in weight: 60Kg/h
2.It should be able to operate not less than 10 hours/day.
3.This incinerator must be able to destruct all combustible wastes produced by hospitals, private clinics, laboratories, institutes, etc..
4.Design Specification: Types A, B, C, D and E of medical waste
5.“PYROLYTIC” combustion by controlling the gasification of waste.
6.The incinerator must avoid the release of black smoke and fine dust, (smokeless) during the loadings.
7.It should be able to reduce the volume of wastes by 98%
8.It should be able to hold emission in the second burn with gas residence of not less than 2 seconds.
9.The incineration should be completely free from visible smoke as well as offensive odours.
10.The lower calorific power (L.C.P) of this waste will be 3,500 kcal/kg
the temperatures of combustion: Minimum will be 850oC and max 1400oC
post combustion:>1100oC
11.The internal diameter of the chimney:Ø400 and its height: 8m
12.The volume of the combustion chamber: 1,200L
13.The dimension of the door for loading in cm: 70 x 70
14.Burner operation should be automatic on/off
15.Fuel: diesel
16.The supplier must provide necessary information for the best of the installation.  This incinerator with “PYROLYTIC” combustion must have:
17.A combustion chamber of waste:
Perfectly tight door for the manual loading of waste.  The loading should be manual, batch load.
A burner of lighting which the use is limited to the ignition of waste.
Frontage of loading with door seals gone up on hinges, wheel of screw plug, flexible joint, and stuffing insulating out of refractory.
The insulation of the combustion chamber should be composed of refractory bricks, having a high content of aluminium and insulates bricks in order to assure a minimum temperature on the outside sheet metal.
Composition of the refractory;
Refractory concrete:
Thickness :>100mm
Nature: 42% of Al203
Insulate in fibrous panels:
Thickness: >75mm
Nature: Calcium silicate.
Burner of lighting of waste, with fuel, standard mono-bloc casting guiding plunging flame, lighting and safety of electronic ignition, permanent ventilation, electromagnetic sluice gate of regulation and isolating valve.
Plate of combustion in Carborundum, avoiding the fixing of glass and slags.

Incinerator Operating period Anticipated daily period 8 hours

Operating period Anticipated daily period 8 hours
Maximum operating period 12hours
Chamber
Should be refractory lined to the following standards, hearth and lower section of chamber walls.
Hot face materials
Super dusty firebricks
Limiting continuous service limit 1500°c
Thickness 100mm
Thermal conductivity 1.3W/mk
Insulation
Calcium silicate
Limiting continuous service limit 1000°c
Thickness 25mm
Thermal conductivity 0.095w/mk
Chimney/stack
Should be manufactured from refractory lined mild steel or high quality air cooled stainless steel. The chimney/stack should have a minimum height of 10 meters above ground level
Ignition burners
Fully packed oil type complete with electric ignition and flame failure controls wired with continuous running fan and complete with all valves, fan and motor
Maximum rating :               at least 450kw/hour
Burner:                                  arranged for on/off operation
Maximum consumption :   at least 6litres per hour
Average consumption :      at least 3litres/hour
After burner
Fully packed oil type complete with electric ignition and flame failure controls wired with continuous running fan and complete with all valves fan and motor.
Maximum rating :     At least 450kw/hour
Burner:                        arranged for on/off operation
Maximum consumption:     at least 9 litres/hour
Average consumption:         at least 4.5 litres /hour
Flue gas treatment
Should have particulate remover (scrubbers)
Electrical supply
Single phase 220/240v a.c,50/60hz
Documentation
Operation manual   2 sets
Service /maintenance manual 2 sets

Incinerator Operating period Anticipated daily period 8 hours

Operating period Anticipated daily period 8 hours
Maximum operating period 12hours
Chamber
Should be refractory lined to the following standards, hearth and lower section of chamber walls.
Hot face materials
Super dusty firebricks
Limiting continuous service limit 1500°c
Thickness 100mm
Thermal conductivity 1.3W/mk
Insulation
Calcium silicate
Limiting continuous service limit 1000°c
Thickness 25mm
Thermal conductivity 0.095w/mk
Chimney/stack
Should be manufactured from refractory lined mild steel or high quality air cooled stainless steel. The chimney/stack should have a minimum height of 10 meters above ground level
Ignition burners
Fully packed oil type complete with electric ignition and flame failure controls wired with continuous running fan and complete with all valves, fan and motor
Maximum rating :               at least 450kw/hour
Burner:                                  arranged for on/off operation
Maximum consumption :   at least 6litres per hour
Average consumption :      at least 3litres/hour
After burner
Fully packed oil type complete with electric ignition and flame failure controls wired with continuous running fan and complete with all valves fan and motor.
Maximum rating :     At least 450kw/hour
Burner:                        arranged for on/off operation
Maximum consumption:     at least 9 litres/hour
Average consumption:         at least 4.5 litres /hour
Flue gas treatment
Should have particulate remover (scrubbers)
Electrical supply
Single phase 220/240v a.c,50/60hz
Documentation
Operation manual   2 sets
Service /maintenance manual 2 sets

multiple diesel fuel combustion chambers

The incinerators to be supplied shall meet the following specifications
1.ISO certified
2.Model:  multiple diesel fuel combustion chambers
3.Performance capacity 
120Kg/hr GRE 1.25 for HCRW
96Kg/hr GRE 1.25 for general waste.
40Kg/hr GRE 3.00 for plastic
4.Waste  type :   health care risk waste and general waste
5. Chimney stack:           
Chimney : 3.5mm mild steel
Height from base :11m and if there are buildings within
                                                30m of the incinerator, chimney must extend at least 3m
                                               above the apexes of all the roof of such buildings
Diameter of chimney at top :430mm
Weight of stack:  ±500 Kg
Case and stack be painted with 400⁰C heat resistant Black paint
6.Burners:
1st  chamber 850⁰C  – 900⁰C
2nd  chamber 1000⁰C
7.Variable speed combustion air blowers
8.Primary chamber volume  ±1.05 cubic metres
9.Mixing chamber volume  ±0.30 cubic metres
10.Settling chamber volume ±0.89 cubic metres
11.Weight excluding chimney  ±6.400Kg at manufacture
12..Firing tools supplied :Hoe ,poker and rake
13.Dimensions
Length                   ±2125mm
Width                    ±1890mm
Height                   ±2125mm
Extra width for burners ± 1000mm
14.Loading door opening 610 *540mm
15.Hearth area  ±1.19square metres
16.Description of grate/hearth :A full hearth to be supplied to prevent contaminated
17.Liquids from flowing into ash pit without being incinerated
18.Compliance with South African Atmospheric Pollution Prevention Act No.45 of 
1965 or equivalent air pollution standards
19.Documents to be supplied :Operations and maintenance manual and standard
operating procedures (SOPs)
        20. Emission controls:
heated refractory screen
Low velocity grit settling chamber
Stainless steel arrester screen

Clover's Social Media